Archives: Quizzes & Surveys

UWJV VICE Mapping Questions for Mechanical Engineer

This quiz is for logged in users only.


Read More

Survey with login

This quiz is for logged in users only.


Read More

Test Questionnaire

Read More

VICE Mapping Questions for Maintenance Planner

Read More

VICE Mapping Questions for HSET Superintendent

Read More

VICE Mapping Questions for Fixed Plant Engineer

Please provide your full name
1. BI-02P.30 Regular and timely maintenance of communications systems equipment - Expectation

Operating sites have highly reliable communications equipment that supports safe and productive mobile equipment operations.

How do we currently meet this expectation? Is it relevant to us?

If No to question 1 above please provide details
Why doesn't BI-02P.30 expectation not apply?
1.1 - Specification
Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

Maintenance strategies related to communication systems are in place for all vehicles on site - covering availability and condition of vehicle mounted and handheld devices. The signal coverage of the Communication system is also assessed on a regular basis.
1.2 - Implement
Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Work orders for equipment on site are completed in a timely manner, and communication systems are given a higher priority, with more frequent proof testing and replacement.
1.3 - Monitor
Please provide details of how the status of the Business Input is monitored.

This should include how comms systems are highlighted as priority items, and the level of over-sight provided by more senior personnel on site.
1.4 - List relevant documents
Please list relevant documents.
1.5 - Attach relevant documents
Please attach relevant documents.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

2. BI-03S.05 Infrastructure protection - placement of barriers and/or warning devices to prevent unwanted vehicle interactions - Expectation

Site infrastructure is protected from unplanned contact with mobile equipment.

Is the expectation of this Business Input relevant in your circumstances?

If No to question 2 above please provide details
Why doesn't BI-03S.05 expectation not apply?
2.1 - Specification
Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

When constructing roads near infrastructure, hazardous locations or work areas the documented requirements include placing windrows, bunds or physical barriers (designed to reduce injury threats if struck (i.e. rounded and/or frangible)) - and where these cannot be placed (e.g. for overhead lines) then warning devices (over height alarms, cable balls, geo fencing etc.), or vision enhancing components (mirrors, translucent ventilation curtains etc.) are installed. 

2.2 - Implement
Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Barriers and warning devices that protect site infrastructure from contact with mobile equipment are installed as designed. 
Protection types include physical barriers that prevent contact through to warning/vision enhancing devices to enhance vehicle operator's situational awareness. 
2.3 - Monitor
Please provide details of how the status of the Business Input is monitored. 

Requirements for inspection, work area standards and peer review of conformance with design protocols could be identified.
2.4 - List relevant documents
Please list all documents here.
2.5 - Attach relevant documents
Please attach documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More

VICE Mapping Questions for General Manager

Please provide your full name
BI-05S.05 Appropriate system for scheduled inspections include structured checklists and defect reporting - Expectation
Structured inspections, conducted by supervisors, workers and others, are effective and efficient.

Is the expectation of this Business Input relevant in your circumstances?
If No to question above please provide details
Why doesn't BI-05S.05 expectation not apply?
Specification
Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

Structured inspections, conducted by supervisors, workers and others, are effective and efficient for:

  • Confirming worker actions are in line with site requirements (procedures, etc.) and mentoring non-conformances in line with performance management protocols 
  • Equipment checks and servicing (with escalation of any identified defects) through pre-start, planned and in-field inspections  
  • Area and facilities inspections (including signage, delineation, windrows/bunds, strata/slope conditions, etc.)
  • Emergency equipment status inspections 
Implement

Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Inspections are scheduled and based on detailed standards e.g. OEM servicing requirements for equipment and engineering/statutory guidance on required frequency of inspection of roadways and surrounding excavations.

The inspection process details the competence required for personnel undertaking and reporting on findings.

Defects/non-conformances are categorised to improve decisions on whether Operators/workers/equipment are safe to continue operating with and other hazards are addressed using the site's performance, hazard and incident reporting protocols.
Monitor
Please provide details of how the status of the Business Input is monitored. 

Comments/evidence here could include how scheduled inspections are carried out to plan, tracking and monitoring of defects and/or TARP levels.  Also include how non-conformances are reacted to in line with performance, defect and TARP protocols. 

List relevant documents
Please list relevant documents here.
Attach relevant documents
Please attach relevant documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More

VICE Mapping Questions for Manager Mining

Please provide your full name
BI-05D.09 Change Management Process - Expectation
Applied and effective change management processes are in use at the operating site.

Is the expectation of this Business Input relevant in your circumstances?
If No to question above please provide details
Why doesn't BI-05D.09 expectation not apply?
Implement

Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

The process is applied when introducing new equipment and new processes.
Superintendents or Supervisors apply the process when there is a need make significant operational changes e.g. in the road network or traffic flows. 

Specification

Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

New equipment, road network, traffic flow adjustments etc. follow a defined change management process that: 

  • Confirms the scope 
  • Identifies potential impacts for mobile equipment and personnel 
  • Confirms how hazards will be controlled e.g. signs, barriers, etc. 
  • Communicates relevant information to personnel 
Monitor
Please provide details of how the status of the Business Input is monitored.

This could include the frequency of oversight provided for change management, change completion reviews/reports and system audit requirements.
List relevant documents
Please list relevant documents here.
Attach relevant documents
Attach all relevant documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More

VICE Mapping Questions for Mine Production Superintendent

Read More

VICE Mapping Questions for Mine Surveyor

Please provide your full name
BI-03P.02 Lighting, delineation and signs are installed and maintained to standards that meet minimum site road design requirements - Expectation

Site road design sets minimum standards for the installation, inspection and maintenance of lighting, delineation and signs that assist vehicle operators maintain situational awareness. 

Is the expectation of this Business Input relevant in your circumstances?

If No to question 1 above please provide details
Why doesn't BI-03P.02 expectation not apply?
1.1 Specification
Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

Designs and construction requirements include standards for lighting of high traffic areas (e.g. around the mine infrastructure areas, dump edges, intersections, etc.) and signs to alert vehicle operators of road network requirements. 

Survey mark out requirements for road network infrastructure to meet site requirements. 
1.2 Implement
Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Road construction crews place and maintain required permanent and temporary lighting, communication / information signage around the road network. 
1.3 Monitor
Please provide details of how the status of the Business Input is monitored. 

Survey regularly mark out and pick up locations of required elements of the surface and underground roadway networks - updating design and as-built plans as required.
1.4 List relevant documents
Please list all relevant documents here.
1.5 Attach relevant documents
Please attach relevant documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More